1. Question: (TCO B) Estimating Procedures
2. Question: (TCO B) Contingency Allowance:
3. Question: (TCO C) Work Breakdown Structure WBS
4. Question: (TCO A) Budgeting processes and techniques
Page 2
1. Question: (TCO C) Schedule Crashing
2. Question: (TCO E) Responsibility Allocation Matrix
3. Question: (TCO E) Resource Allocation/Leveling
Page 3
1. Question: (TCO G) Estimate At Completion forecast (EAC)
2. Question: (TCO D) PMIS and cost accounting
3. Question: (TCO F) Earned Value

PROJ 592 Week 8 Final Exam (Package for 4 Versions)

Purchase here

http://devrycourse.com/proj592week8finalexampackagefor4versions

Product Description

Page 1
1. Question: (TCO B) Estimating Procedures
2. Question: (TCO B) Contingency Allowance:
3. Question: (TCO C) Work Breakdown Structure WBS
4. Question: (TCO A) Budgeting processes and techniques
Page 2
1. Question: (TCO C) Schedule Crashing
2. Question: (TCO E) Responsibility Allocation Matrix
3. Question: (TCO E) Resource Allocation/Leveling
Page 3
1. Question: (TCO G) Estimate At Completion forecast (EAC)
2. Question: (TCO D) PMIS and cost accounting
3. Question: (TCO F) Earned Value

PROJ 592 Week 8 Final Exam (Package for 4 Versions)

Purchase here

http://devrycourse.com/proj592week8finalexampackagefor4versions

Product Description

Page 1
1. Question: (TCO B) Estimating Procedures
2. Question: (TCO B) Contingency Allowance:
3. Question: (TCO C) Work Breakdown Structure WBS
4. Question: (TCO A) Budgeting processes and techniques
Page 2
1. Question: (TCO C) Schedule Crashing
2. Question: (TCO E) Responsibility Allocation Matrix
3. Question:…...

Similar Documents

Proj 592 Week 8 Final Exam

...(Popt+(4XPmost)+Ppess)/6 = (100+(4X120)+180)/6 =$126.67 (b) Pexp = (Popt+(4XPmost)+Ppess)/6 =(32+(4X36)+44)/6 = 36.7 tons (c) Using the expected price and expected quantity, the expected cost using the COMPLEX method is = ((100x32)+(4x126.67x36.7)+(200x44))/6 = ((3200)+(18595.15)+(8800))/6 = 5099.19 |   | Instructor Explanation: | Three-point estimate:  (a) Using the estimator Pexp = (Popt + 4Pmost like + Ppess) / 6, the expected price is (100+ (4 x 120) + 200) / 6 = $130.00/ton   (b) Using the same estimator, the expected amount= (32+ (4 x 36) + 44) / 6 = 36.67 tons   (c) Estimate of the most likely cost is the product of the most likely price and most likely amount that will be used. Use a similar estimating procedure for the most optimistic and most pessimistic costs and then use the 3 point formula again.   Most likely cost: | $130/ton x 36.67 tons = $4,766.67 | Most optimistic cost: | $100 x 32 tons = $3,200 | Most pessimistic cost: | $200 x 44 tons = $8,800 | The expected cost for material A is:                   ($3,200 + (4 x  $4,766.67) + $8,800) / 6  = $5,177.78   | | |   | Points Received: | 26 of 30 |   | Comments: | | | | Question 2. | Question : | (TCO B) Contingency Allowance:  You are a project manager for the development of Motorola's new 4G, HD, Touch Screen Cell Phone which is supposed to take the cell phone industry by storm. Listed below are the initial cost estimates for the materials and labor for one of the......

Words: 3918 - Pages: 16

Devry Proj 592 Week 8 Final Exam - Latest

...Devry PROJ 592 Week 8 Final Exam - Latest IF You Want To Purchase A+ Work Then Click The Link Below , Instant Download http://www.hwspeed.com/Devry-PROJ-592-Week-8-Final-Exam-Latest-7676767678888.htm?categoryId=-1 If You Face Any Problem E- Mail Us At JOHNMATE1122@Gmail.Com Question 1. | Question : | (TCO B) Estimating Procedures (a) You are the project manager for a new high-rise office building. You are working on estimating the exterior landscaping for the new development. The landscaping requires the use of a special landscape stone. Based on recent experience, the most likely price for the material is $120.00/ton. However, the price for this stone is volatile, and the price fluctuates over time based on market conditions and material availability. The most optimistic price estimate is $100.00/ton, and the most pessimistic estimate is $200.00/ton.What is the expected price of the material? (b) In addition to price fluctuations, you are also uncertain of how much of the material will be required for the project. Scope changes and site conditions will affect the amount of material actually needed. The most likely amount required is 36 tons. However, as little as 32 tons or as much as 44 tons might be required.What is the expected amount of the material needed for the project? Round to two decimal places. (c) Using the estimates from (a) & (b) what is the expected cost for the material over the life of the project using the COMPLEX method?......

Words: 1545 - Pages: 7

Devry Proj 592 Week 8 Final Exam - Latest

...Devry PROJ 592 Week 8 Final Exam - Latest IF You Want To Purchase A+ Work Then Click The Link Below , Instant Download http://www.hwspeed.com/Devry-PROJ-592-Week-8-Final-Exam-Latest-7676767678888.htm?categoryId=-1 If You Face Any Problem E- Mail Us At JOHNMATE1122@Gmail.Com Question 1. | Question : | (TCO B) Estimating Procedures (a) You are the project manager for a new high-rise office building. You are working on estimating the exterior landscaping for the new development. The landscaping requires the use of a special landscape stone. Based on recent experience, the most likely price for the material is $120.00/ton. However, the price for this stone is volatile, and the price fluctuates over time based on market conditions and material availability. The most optimistic price estimate is $100.00/ton, and the most pessimistic estimate is $200.00/ton.What is the expected price of the material? (b) In addition to price fluctuations, you are also uncertain of how much of the material will be required for the project. Scope changes and site conditions will affect the amount of material actually needed. The most likely amount required is 36 tons. However, as little as 32 tons or as much as 44 tons might be required.What is the expected amount of the material needed for the project? Round to two decimal places. (c) Using the estimates from (a) & (b) what is the expected cost for the material over the life of the project using the COMPLEX method?......

Words: 1545 - Pages: 7

Devry Proj 592 Week 8 Final Exam - Latest

...Devry PROJ 592 Week 8 Final Exam - Latest IF You Want To Purchase A+ Work Then Click The Link Below , Instant Download http://www.hwspeed.com/Devry-PROJ-592-Week-8-Final-Exam-Latest-7676767678888.htm?categoryId=-1 If You Face Any Problem E- Mail Us At JOHNMATE1122@Gmail.Com Question 1. | Question : | (TCO B) Estimating Procedures (a) You are the project manager for a new high-rise office building. You are working on estimating the exterior landscaping for the new development. The landscaping requires the use of a special landscape stone. Based on recent experience, the most likely price for the material is $120.00/ton. However, the price for this stone is volatile, and the price fluctuates over time based on market conditions and material availability. The most optimistic price estimate is $100.00/ton, and the most pessimistic estimate is $200.00/ton.What is the expected price of the material? (b) In addition to price fluctuations, you are also uncertain of how much of the material will be required for the project. Scope changes and site conditions will affect the amount of material actually needed. The most likely amount required is 36 tons. However, as little as 32 tons or as much as 44 tons might be required.What is the expected amount of the material needed for the project? Round to two decimal places. (c) Using the estimates from (a) & (b) what is the expected cost for the material over the life of the project using the COMPLEX method?......

Words: 1545 - Pages: 7

Devry Proj 592 Week 8 Final Exam - Latest

...Devry PROJ 592 Week 8 Final Exam - Latest IF You Want To Purchase A+ Work Then Click The Link Below , Instant Download http://www.hwspeed.com/Devry-PROJ-592-Week-8-Final-Exam-Latest-7676767678888.htm?categoryId=-1 If You Face Any Problem E- Mail Us At JOHNMATE1122@Gmail.Com Question 1. | Question : | (TCO B) Estimating Procedures (a) You are the project manager for a new high-rise office building. You are working on estimating the exterior landscaping for the new development. The landscaping requires the use of a special landscape stone. Based on recent experience, the most likely price for the material is $120.00/ton. However, the price for this stone is volatile, and the price fluctuates over time based on market conditions and material availability. The most optimistic price estimate is $100.00/ton, and the most pessimistic estimate is $200.00/ton.What is the expected price of the material? (b) In addition to price fluctuations, you are also uncertain of how much of the material will be required for the project. Scope changes and site conditions will affect the amount of material actually needed. The most likely amount required is 36 tons. However, as little as 32 tons or as much as 44 tons might be required.What is the expected amount of the material needed for the project? Round to two decimal places. (c) Using the estimates from (a) & (b) what is the expected cost for the material over the life of the project using the COMPLEX method?......

Words: 1545 - Pages: 7

Proj 592 Week 8 Final Exam (Package for 4 Versions)

...PROJ 592 Week 8 Final Exam (Package for 4 Versions) Purchase here http://chosecourses.com/PROJ%20592/proj-592-week-8-final-exam-package-for-4-versions Product Description Page 1 Question: (TCO B) Estimating Procedures Question: (TCO B) Contingency Allowance: Question: (TCO C) Work Breakdown Structure WBS Question: (TCO A) Budgeting processes and techniques Page 2 Question: (TCO C) Schedule Crashing Question: (TCO E) Responsibility Allocation Matrix Question: (TCO E) Resource Allocation/Leveling Page 3 Question: (TCO G) Estimate At Completion forecast (EAC) Question: (TCO D) PMIS and cost accounting Question: (TCO F) Earned Value PROJ 592 Week 8 Final Exam (Package for 4 Versions) Purchase here http://chosecourses.com/PROJ%20592/proj-592-week-8-final-exam-package-for-4-versions Product Description Page 1 Question: (TCO B) Estimating Procedures Question: (TCO B) Contingency Allowance: Question: (TCO C) Work Breakdown Structure WBS Question: (TCO A) Budgeting processes and techniques Page 2 Question: (TCO C) Schedule Crashing Question: (TCO E) Responsibility Allocation Matrix Question: (TCO E) Resource Allocation/Leveling Page 3 Question: (TCO G) Estimate At Completion forecast (EAC) Question: (TCO D) PMIS and cost accounting Question: (TCO F) Earned Value PROJ 592 Week 8 Final Exam (Package for 4......

Words: 672 - Pages: 3

Proj 592 Week 8 Final Exam (Package for 4 Versions)

...PROJ 592 Week 8 Final Exam (Package for 4 Versions) Purchase here http://chosecourses.com/PROJ%20592/proj-592-week-8-final-exam-package-for-4-versions Product Description Page 1 1. Question: (TCO B) Estimating Procedures 2. Question: (TCO B) Contingency Allowance: 3. Question: (TCO C) Work Breakdown Structure WBS 4. Question: (TCO A) Budgeting processes and techniques Page 2 1. Question: (TCO C) Schedule Crashing 2. Question: (TCO E) Responsibility Allocation Matrix 3. Question: (TCO E) Resource Allocation/Leveling Page 3 1. Question: (TCO G) Estimate At Completion forecast (EAC) 2. Question: (TCO D) PMIS and cost accounting 3. Question: (TCO F) Earned Value PROJ 592 Week 8 Final Exam (Package for 4 Versions) Purchase here http://chosecourses.com/PROJ%20592/proj-592-week-8-final-exam-package-for-4-versions Product Description Page 1 1. Question: (TCO B) Estimating Procedures 2. Question: (TCO B) Contingency Allowance: 3. Question: (TCO C) Work Breakdown Structure WBS 4. Question: (TCO A) Budgeting processes and techniques Page 2 1. Question: (TCO C) Schedule Crashing 2. Question: (TCO E) Responsibility Allocation Matrix 3. Question: (TCO E) Resource Allocation/Leveling Page 3 1. Question: (TCO G) Estimate At Completion forecast (EAC) 2. Question: (TCO D) PMIS and cost accounting 3. Question: (TCO F) Earned Value PROJ 592 Week 8 Final Exam (Package for 4 Versions) ...

Words: 742 - Pages: 3

Proj 586 Week 8 Final Exam (Version 2)

...PROJ 586 Week 8 Final Exam (Version 2) Purchase here http://chosecourses.com/PROJ%20586/proj-586-week-8-final-exam-version-2 Product Description Page 1 1. (TCO A) In a _____ organization, the project manager does not have complete authority over the project team. (Points : 5) 2. (TCO H) What is the longest phase of the project life cycle? (Points : 5) 3. (TCO B) A(n) _____ is defined as a piece of work that consumes time. (Points : 5) 4. (TCO D) All of the following are risk response types except _____. (Points : 5) 5. (TCO F) The two most common types of project reports are _____. (Points : 5) 6. (TCO C) The _____ time is the latest time by which a particular activity must be finished in order for the entire project to be completed by its required completion time. (Points : 5) 7. (TCO G) Which of the following is not an advantage of using project management software? (Points : 5) 8. (TCO A) Projects are identified and selected in the _____. (Points : 5) 9. (TCO C) In addition to showing the technical constraints among activities, how does the network diagram logic also take into account resource constraints? (Points : 5) 10. (TCO F) The budget for each work package is _____. (Points : 5) 11. (TCO F) The _____ for the entire project or for each work package provides a baseline against which actual cost and work performance can be compared at any time during the project. (Points : 5) 12. (TCO C) Calculate the earliest start for Task B......

Words: 4856 - Pages: 20

Proj 592 Week 8 Final Exam (Package for 4 Versions)

...PROJ 592 Week 8 Final Exam (Package for 4 Versions) Purchase here http://chosecourses.com/PROJ%20592/proj-592-week-8-final-exam-package-for-4-versions Product Description Page 1 Question: (TCO B) Estimating Procedures Question: (TCO B) Contingency Allowance: Question: (TCO C) Work Breakdown Structure WBS Question: (TCO A) Budgeting processes and techniques Page 2 Question: (TCO C) Schedule Crashing Question: (TCO E) Responsibility Allocation Matrix Question: (TCO E) Resource Allocation/Leveling Page 3 Question: (TCO G) Estimate At Completion forecast (EAC) Question: (TCO D) PMIS and cost accounting Question: (TCO F) Earned Value PROJ 592 Week 8 Final Exam (Package for 4 Versions) Purchase here http://chosecourses.com/PROJ%20592/proj-592-week-8-final-exam-package-for-4-versions Product Description Page 1 Question: (TCO B) Estimating Procedures Question: (TCO B) Contingency Allowance: Question: (TCO C) Work Breakdown Structure WBS Question: (TCO A) Budgeting processes and techniques Page 2 Question: (TCO C) Schedule Crashing Question: (TCO E) Responsibility Allocation Matrix Question: (TCO E) Resource Allocation/Leveling Page 3 Question: (TCO G) Estimate At Completion forecast (EAC) Question: (TCO D) PMIS and cost accounting Question: (TCO F) Earned Value PROJ 592 Week 8 Final Exam (Package for 4......

Words: 384 - Pages: 2

Proj 592 Week 8 Final Exam (Package for 4 Versions)

...PROJ 592 Week 8 Final Exam (Package for 4 Versions) Purchase here http://chosecourses.com/PROJ%20592/proj-592-week-8-final-exam-package-for-4-versions Product Description Page 1 1. Question: (TCO B) Estimating Procedures 2. Question: (TCO B) Contingency Allowance: 3. Question: (TCO C) Work Breakdown Structure WBS 4. Question: (TCO A) Budgeting processes and techniques Page 2 1. Question: (TCO C) Schedule Crashing 2. Question: (TCO E) Responsibility Allocation Matrix 3. Question: (TCO E) Resource Allocation/Leveling Page 3 1. Question: (TCO G) Estimate At Completion forecast (EAC) 2. Question: (TCO D) PMIS and cost accounting 3. Question: (TCO F) Earned Value PROJ 592 Week 8 Final Exam (Package for 4 Versions) Purchase here http://chosecourses.com/PROJ%20592/proj-592-week-8-final-exam-package-for-4-versions Product Description Page 1 1. Question: (TCO B) Estimating Procedures 2. Question: (TCO B) Contingency Allowance: 3. Question: (TCO C) Work Breakdown Structure WBS 4. Question: (TCO A) Budgeting processes and techniques Page 2 1. Question: (TCO C) Schedule Crashing 2. Question: (TCO E) Responsibility Allocation Matrix 3. Question: (TCO E) Resource Allocation/Leveling Page 3 1. Question: (TCO G) Estimate At Completion forecast (EAC) 2. Question: (TCO D) PMIS and cost accounting 3. Question: (TCO F) Earned Value PROJ 592 Week 8 Final Exam (Package for 4 Versions) ...

Words: 636 - Pages: 3

Proj 592 Week 8 Final Exam (Package for 4 Versions) Purchase Here Http: //Chosecourses.Com/Proj%20592/Proj-592-Week-8-Final-Exam-Package-for-4-Versions Product Description Page 1 1. Question: (Tco B) Estimating

...PROJ 592 Full Course Project (Par 1 and Part 2) Purchase here http://chosecourses.com/PROJ%20592/proj-592-full-course-project-par-1-and-part-2 Product Description PROJ 592 Week 4 Course Project, Part 1 (CP-1) PROJ 592 Week 7 Course Project, Part 2 (C-P2) PROJ 592 Full Course Project (Par 1 and Part 2) Purchase here http://chosecourses.com/PROJ%20592/proj-592-full-course-project-par-1-and-part-2 Product Description PROJ 592 Week 4 Course Project, Part 1 (CP-1) PROJ 592 Week 7 Course Project, Part 2 (C-P2) PROJ 592 Full Course Project (Par 1 and Part 2) Purchase here http://chosecourses.com/PROJ%20592/proj-592-full-course-project-par-1-and-part-2 Product Description PROJ 592 Week 4 Course Project, Part 1 (CP-1) PROJ 592 Week 7 Course Project, Part 2 (C-P2) PROJ 592 Full Course Project (Par 1 and Part 2) Purchase here http://chosecourses.com/PROJ%20592/proj-592-full-course-project-par-1-and-part-2 Product Description PROJ 592 Week 4 Course Project, Part 1 (CP-1) PROJ 592 Week 7 Course Project, Part 2 (C-P2) PROJ 592 Full Course Project (Par 1 and Part 2) Purchase here http://chosecourses.com/PROJ%20592/proj-592-full-course-project-par-1-and-part-2 Product Description PROJ 592 Week 4 Course Project, Part 1 (CP-1) PROJ 592 Week 7 Course Project, Part 2 (C-P2) PROJ 592 Full Course Project (Par 1...

Words: 344 - Pages: 2

Proj 592 Week 8 Final Exam Package for 4 Versions

...PROJ 592 WEEK 8 FINAL EXAM PACKAGE FOR 4 VERSIONS To purchase this visit following link: http://www.activitymode.com/product/proj-592-week-8-final-exam-package-for-4-versions/ Contact us at: SUPPORT@ACTIVITYMODE.COM PROJ 592 WEEK 8 FINAL EXAM PACKAGE FOR 4 VERSIONS PROJ 592 Week 8 Final Exam Package for 4 Versions Page 1 1. Question: (TCO B) Estimating Procedures 2. Question: (TCO B) Contingency Allowance: 3. Question: (TCO C) Work Breakdown Structure WBS 4. Question: (TCO A) Budgeting processes and techniques Page 2 1. Question: (TCO C) Schedule Crashing 2. Question: (TCO E) Responsibility Allocation Matrix 3. Question: (TCO E) Resource Allocation/Leveling Page 3 1. Question: (TCO G) Estimate At Completion forecast (EAC) 2. Question: (TCO D) PMIS and cost accounting 3. Question: (TCO F) Earned Value Activity mode aims to provide quality study notes and tutorials to the students of PROJ 592 Week 8 Final Exam Package for 4 Versions in order to ace their studies. PROJ 592 WEEK 8 FINAL EXAM PACKAGE FOR 4 VERSIONS To purchase this visit following link: http://www.activitymode.com/product/proj-592-week-8-final-exam-package-for-4-versions/ Contact us at: SUPPORT@ACTIVITYMODE.COM PROJ 592 WEEK 8 FINAL EXAM PACKAGE FOR 4 VERSIONS PROJ 592 Week 8 Final Exam Package for 4 Versions Page 1 1. Question: (TCO B) Estimating Procedures 2. Question: (TCO B) Contingency Allowance: 3. Question: (TCO C) Work Breakdown Structure WBS 4. Question: (TCO A)......

Words: 657 - Pages: 3

Proj 586 Week 8 Final Exam Version 2

...PROJ 586 WEEK 8 FINAL EXAM VERSION 2 To purchase this visit following link: http://www.activitymode.com/product/proj-586-week-8-final-exam-version-2/ Contact us at: SUPPORT@ACTIVITYMODE.COM PROJ 586 WEEK 8 FINAL EXAM VERSION 2 PROJ 586 Week 8 Final Exam Version 2 1. (TCO A) In a _____ organization, the project manager does not have complete authority over the project team. (Points : 5) 2. (TCO H) What is the longest phase of the project life cycle? (Points : 5) 3. (TCO B) A(n) _____ is defined as a piece of work that consumes time. (Points : 5) 4. (TCO D) All of the following are risk response types except _____. (Points : 5) 5. (TCO F) The two most common types of project reports are _____. (Points : 5) 6. (TCO C) The _____ time is the latest time by which a particular activity must be finished in order for the entire project to be completed by its required completion time. (Points : 5) 7. (TCO G) Which of the following is not an advantage of using project management software? (Points : 5) 8. (TCO A) Projects are identified and selected in the _____. (Points : 5) 9. (TCO C) In addition to showing the technical constraints among activities, how does the network diagram logic also take into account resource constraints? (Points : 5) 10. (TCO F) The budget for each work package is _____. (Points : 5) 11. (TCO F) The _____ for the entire project or for each work package provides a baseline against which actual cost and work performance can be compared at any......

Words: 985 - Pages: 4

Proj 586 Week 8 Final Exam (Version 2)

...PROJ 586 Week 8 Final Exam (Version 2) Purchase here http://chosecourses.com/PROJ%20586/proj-586-week-8-final-exam-version-2 Product Description Page 1 1. (TCO A) In a _____ organization, the project manager does not have complete authority over the project team. (Points : 5) 2. (TCO H) What is the longest phase of the project life cycle? (Points : 5) 3. (TCO B) A(n) _____ is defined as a piece of work that consumes time. (Points : 5) 4. (TCO D) All of the following are risk response types except _____. (Points : 5) 5. (TCO F) The two most common types of project reports are _____. (Points : 5) 6. (TCO C) The _____ time is the latest time by which a particular activity must be finished in order for the entire project to be completed by its required completion time. (Points : 5) 7. (TCO G) Which of the following is not an advantage of using project management software? (Points : 5) 8. (TCO A) Projects are identified and selected in the _____. (Points : 5) 9. (TCO C) In addition to showing the technical constraints among activities, how does the network diagram logic also take into account resource constraints? (Points : 5) 10. (TCO F) The budget for each work package is _____. (Points : 5) 11. (TCO F) The _____ for the entire project or for each work package provides a baseline against which actual cost and work performance can be compared at any time during the project. (Points : 5) 12. (TCO C) Calculate the earliest start for Task B......

Words: 5827 - Pages: 24

Proj 592 Week 8 Final Exam Package for 4 Versions

...PROJ 592 WEEK 8 FINAL EXAM PACKAGE FOR 4 VERSIONS To Purchase this tutorial visit following link http://wiseamerican.us/product/proj-592-week-8-final-exam-package-4-versions/ Contact us at: SUPPORT@WISEAMERICAN.US • DESCRIPTION • REVIEWS (0) PROJ 592 WEEK 8 FINAL EXAM PACKAGE FOR 4 VERSIONS Page 1 1. Question: (TCO B) Estimating Procedures 2. Question: (TCO B) Contingency Allowance: 3. Question: (TCO C) Work Breakdown Structure WBS 4. Question: (TCO A) Budgeting processes and techniques Page 2 1. Question: (TCO C) Schedule Crashing 2. Question: (TCO E) Responsibility Allocation Matrix 3. Question: (TCO E) Resource Allocation/Leveling Page 3 1. Question: (TCO G) Estimate At Completion forecast (EAC) 2. Question: (TCO D) PMIS and cost accounting 3. Question: (TCO F) Earned Value • DESCRIPTION • REVIEWS (0) PROJ 592 WEEK 8 FINAL EXAM PACKAGE FOR 4 VERSIONS Page 1 1. Question: (TCO B) Estimating Procedures 2. Question: (TCO B) Contingency Allowance: 3. Question: (TCO C) Work Breakdown Structure WBS 4. Question: (TCO A) Budgeting processes and techniques Page 2 1. Question: (TCO C) Schedule Crashing 2. Question: (TCO E) Responsibility Allocation Matrix 3. Question: (TCO E) Resource Allocation/Leveling Page 3 1. Question: (TCO G) Estimate At Completion forecast (EAC) 2. Question: (TCO D) PMIS and cost accounting 3. Question: (TCO F) Earned Value • DESCRIPTION • REVIEWS (0) PROJ 592 WEEK 8 FINAL EXAM PACKAGE FOR 4 VERSIONS Page 1 1. Question:...

Words: 306 - Pages: 2